Imatra Electricity Substation
-
2022
-
Architectural
Architectual Design
The project is composed of an electricity substation building and five transmission towers, set in a beautiful, protected landscape. Built for the Finnish main grid operator Fingrid Oyj, the new facilities replaced an air-insulated switchgear system and a number of transmission towers at the end of their life cycle.